著者
江川 堯
出版者
石油技術協会
雑誌
石油技術協会誌 (ISSN:03709868)
巻号頁・発行日
vol.62, no.2, pp.112-121, 1997 (Released:2008-03-27)
参考文献数
4

Construction of a natural gas pipeline from Niigata to Sendai was completed in March 1996. Pipeline construction consists of engineering works such as civil engineering, material technology, welding technology and so on. This lecture presents the following items regarding the engineering works to be overcome and some technical skills associated with the project are introduced.i) Seismic designii) Material technology, welding technology, field bendingiii) Bridge design, tunnel designiv) Leak detection

言及状況

外部データベース (DOI)

Twitter (1 users, 1 posts, 0 favorites)

J-STAGE Articles - 新潟•仙台間天然ガスパイプラインの建設 https://t.co/uV5QarqJOX 読んでる

収集済み URL リスト