著者
渡辺 貴介 ラプキタロウ スントン
出版者
Japan Society of Civil Engineers
雑誌
日本土木史研究発表会論文集 (ISSN:09134107)
巻号頁・発行日
vol.4, pp.143-150, 1984-06-25 (Released:2010-06-15)
参考文献数
5

The paddy field reclamation work in the Edo period was usually made through the construction of irrigation system and the extensive implementation of cropping program. The project of Sarmtongi, being started in 1854, was initiated from theagricultural waterpaths operated under a relatively distinctive construction technology of the time. Furthermore, the new town and regional planning idea was peerlessly and successfully conducted. This historical performance is verified to be in close consistency with our contemporary theory for regional planning and is still the principle for the development of Towada City nowadays.

言及状況

外部データベース (DOI)

Twitter (83 users, 83 posts, 87 favorites)

新渡戸傳(つとう)の画像は下記HPより https://t.co/IjvVzXRZG5 本日の参考文献 十和田市三本木原開発における用水開削技術の問題 https://t.co/vhFfcFL43h 幕末期の三本木開発事業における地域開発と新都市開発の思想と構想 https://t.co/XusIbZFSgi 農林水産省・東北農政局 https://t.co/KGJPIStWQt

収集済み URL リスト