著者
阿部 一郎
出版者
The Mining and Materials Processing Institute of Japan
雑誌
Journal of MMIJ : journal of the Mining and Materials Processing Institute of Japan (ISSN:18816118)
巻号頁・発行日
vol.126, no.8, pp.477-481, 2010-08-25
被引用文献数
1

Sumitomo Metal Mining Co., Ltd. focuses on the "non-ferrous major class" mining company as its business strategy and the Pogo Gold Mine is situated at a very important position to achieve the goal. The mine was started with the grassroots exploration in 1991, as a first exploration project in which Sumitomo Metal Mining has majority share of project. A couple of gold deposits were discovered and defined during the exploration stage and the project was evaluated feasible to develop. The environmental permit process was started in 2000 and completed in 2004, in which especially the ore process flow was designed very carefully to prevent the surrounding nature from any impacts. The intensive construction works were initiated after approval of the environmental permits and twenty months had been spent to start ore processing in February 2006. The mine adopts the drift and fill mining method with paste backfill by using tailings from the ore process. Currently about 2,400tonnes/day of ore are mined and processed, which are above the plan in the feasibility study.

言及状況

外部データベース (DOI)

Twitter (2 users, 2 posts, 0 favorites)

1 1 https://t.co/iptn6byP9k
こんな論文どうですか? 米国・アラスカ州 ポゴ金鉱山の探鉱・開発と安定操業の達成について(阿部 一郎),2010 https://t.co/3LxbiDIbvu

収集済み URL リスト