著者
榎本 穣
出版者
Atomic Energy Society of Japan
雑誌
日本原子力学会誌 (ISSN:00047120)
巻号頁・発行日
vol.19, no.8, pp.530-534, 1977

Fukushima Daiichi Nuclear Power Station Unit-3 is a BWR unit located in the seaside area of Okuma town in Fukushima Prefecture. Its thermal output is 2, 381 MWt; and the electrical rating is 784 MWe. The construction at the site started in Aug. 1970; and the commercial operation began on Mar. 27, 1976. The plant has been operated satisfactory and was shutdown Mar. 1, 1977 for the first annual inspection outage.<br>Here are the summary of the plant facility and the operating experience.

言及状況

外部データベース (DOI)

Wikipedia (1 pages, 1 posts, 1 contributors)

収集済み URL リスト