著者
辻 正 寺井 勇三 大岡 五三實 宇多田 修 木下 進一 高城 敏美
出版者
一般社団法人日本機械学会
雑誌
動力・エネルギー技術の最前線講演論文集 : シンポジウム
巻号頁・発行日
vol.2004, no.9, pp.165-168, 2004-06-22

This paper proposes the early stage Plan that Iron works and Refinery cooperate to save energy and to increase Co-production Blast Furnace process is originally Co-production process (Iron production & Gasification production) Excess fuels (asphalt & pulverized coal) injecting into Blast Furnace is gasified high-efficiently (95〜98%) At the early stage Plan, Excess fuels are asphalt 60kg/ton-pig iron and pulverized coal 65kg/ton-pig iron. This Blast Furnace Gasification System and BFG (Blast Furnace Gas) Combined Cycle Power System are optimized in a typical Iron works model (6mihon ton/Y steel product) with Pinch Technology method This Optimization yields Power (559MW) and surplus COG (Coke Oven Gas) that is exported to Refinery Energy saving 13% of total Iron works energy consumption is estimated.

言及状況

Twitter (1 users, 1 posts, 0 favorites)

こんな論文どうですか? 高炉によるガス燃料生産および高炉・ガスタービン複合発電システムの最適化(FP2 燃料多様化・環境技術1)(辻正ほか),2004 http://id.CiNii.jp/RBczL

収集済み URL リスト