著者
山本 哲也
出版者
一般社団法人日本機械学会
雑誌
年次大会講演資料集
巻号頁・発行日
vol.2009, no.9, pp.190-191, 2009-09-12

The new nuclear inspection system established by the Nuclear and Industrial Safety Agency (NISA) came into force in January 2009. The NISA focused on the maintenance program to set up the new system. The new inspection system require the report of the maintenance plan to the NISA, safety verification of the plan by the NISA, collection of deterioration data of facilities, reflection of the data on self check, and online monitor of concerned equipment. Utilities have reported approximately 30 of their maintenance plans to the NISA. The NISA carries the periodic inspections after it check those maintenance clans.

言及状況

Twitter (1 users, 1 posts, 0 favorites)

こんな論文どうですか? F0801(2) 新検査制度の概要とその運用状況([F0801]原子力の安全規制の最適化,先端技術フォーラム)(山本 哲也),2009 http://id.CiNii.jp/hmDbL

収集済み URL リスト