著者
橋本 宇一 木原 博 安藤 良夫
出版者
社団法人溶接学会
雑誌
溶接学会誌 (ISSN:00214787)
巻号頁・発行日
vol.33, no.4, pp.357-363, 1964-04-25

The first nuclear power station in Japan (Advanced Calder Hall type, 166MW electric) is now under construction at Tokaimura. Construction of several new nuclear power stations will begin within a few years and also building project of the first nuclear powered ship (6500 G. T.) has been started in 1963. Al-killed steel plates 80∿94mm thick were manually welded for Tokai reactor pressure vessel and its steam raising units were constructed with 54∿74mm thick boiler plates using both submerged arc and manual welding. JPDR is a small BWR (12.5MW electric), and the inner surface of its pressure vessel was stainless steel cladded by submerged arc process. Researches on the welding of the nuclear reactor have been extensively carried out by Japan Welding Engineering Society and also each industrial plant is doing its own researches. The study on the effect of irradiation on the properties of materials has been just started.

言及状況

外部データベース (DOI)

Twitter (1 users, 1 posts, 0 favorites)

1960年代の商業炉時代を見据えた東海原発建設時の溶接の問題についての論文。当初の圧力容器用の鋼板はイギリス製という話だったり、原燃の敦賀についての言及もあったりして大変興味深いな。http://t.co/hSOnYNv9

収集済み URL リスト