著者
前川 雄一
出版者
一般社団法人 電気学会
雑誌
電気学会論文誌B(電力・エネルギー部門誌) (ISSN:03854213)
巻号頁・発行日
vol.129, no.10, pp.1170-1173, 2009-10-01 (Released:2009-10-01)
参考文献数
7

This paper describes an outline of the Honshu-Shikoku Interconnecting Transmission Line which includes the first large-scale cable line. The most significant feature of this transmission line is the installation of 500kV cables along various types of bridges. This brought many previously unknown technical hurdles such as techniques to overcome movements and vibrations of a series of large bridges. These hurdles were cleared through various efforts and techniques by the concerned parties.