著者
紅林 章央 前田 研一 伊東 孝
出版者
Japan Society of Civil Engineers
雑誌
土木史研究論文集 (ISSN:13495712)
巻号頁・発行日
vol.25, pp.99-116, 2006-06-15 (Released:2010-06-04)
参考文献数
16

This study is made for demonstrating the construction projects about bridges on Ome-Street in Okutama Town in Tokyo. These can be classified into three periods. In the first period, from 4 to 10 years in Showa Era, the Civil Department of Tokyo Prefecture made the street wide. In the second, from 12 to 13 years in Showa Era, the waterworks bureau of Tokyo City built the street to transport the construction materials of the Ogouchi-Dam. In the third, from 31 to 32 years in Showa Era, the waterworks bureau of Tokyo Prefecture built the street in the areas which were under water by building the Ogouchi-Dam. In the first, six long-span bridges were all different, and short-span bridges were rainforced concrete arch bridges. In the second, three bridges were designed by Masayosi Kabashima, Jun Masuda, Katsutake Naruse, famous technicians of bridges. In the third, five arch bridges designed by Katsutake Naruse and Samon Honma were all different.
著者
紅林 章央 前田 研一 伊東 孝
出版者
Japan Society of Civil Engineers
雑誌
土木史研究論文集 (ISSN:13495712)
巻号頁・発行日
vol.24, pp.75-94, 2005-05-15 (Released:2010-06-04)
参考文献数
63
被引用文献数
1

In this study, the authors listed the concrete arch highway bridges that were built in Japan before World War II. And we classified them into the three types of arch bridges, single span, multi span deck types and through type, in addition, arranged chronologically and classified them into the areas, the structures, the designs and the designers. Next we analyzed characteristics of ages, areas, structures and designs of them. Based on this study, we found that those were built in Nagasaki, Kobe, Kyoto and Tokyo City in Meiji Era at first, Aichi and Ehime in Taisho Era, and next, those had made rapid progress though Reconstruction Program in Tokyo after Kanto-Earthquake and Urban Planning in Osaka City, and after that, the techniques of building spread in Kanto and Tohoku. And we made clear that most of spandrel-filled arch bridges were built below about 30m, and about 40 Melan-arches were built, and arch-rib structure as many as arch-ring structure were built, almost arches were built the fixed arch, most arcade-structure of arch-spandrel had been built for 10 years since 1927, and fixed arch-spandrel pediment changed to pasting stones then changed to concrete walls.