- 著者
-
永尾 眞
福島 清
曽根 巨充
藤井 裕彦
松葉 裕
綱川 隆司
東間 敬造
萱島 敬
- 出版者
- 一般社団法人日本建築学会
- 雑誌
- 日本建築学会技術報告集 (ISSN:13419463)
- 巻号頁・発行日
- no.21, pp.373-377, 2005-06-20
- 被引用文献数
-
6
Recently in the construction industry rationalization in production systems are aimed at in order to improve the cost competitiveness. This time, we could get the chance of controlling the cost in early stages of design process. In the conventional procedure, the cost estimate is done in two stages consisting of preliminary estimate and detailed estimate later resulting in reconsideration of design in order to match with the budget. Using 3D-CAD we could do the estimate in each step of design and fit into the budget.