- 著者
-
島田 隆
松井 嶺迪
西村 正史
石田 安弘
森 行秀
黒田 一彦
- 出版者
- 一般社団法人 日本原子力学会
- 雑誌
- 日本原子力学会和文論文誌 (ISSN:13472879)
- 巻号頁・発行日
- vol.10, no.4, pp.310-322, 2011 (Released:2011-11-30)
- 参考文献数
- 6
This paper discusses the reprocessing plant concept suitable for the transition period from the Light Water Reactors (LWRs) to the Fast Breeder Reactors (FBRs). This transition requires the reprocessing of spent fuels in order to supply an adequate volume of fissile plutonium (Pu-fissile) for the FBRs. The transition period would continue for more than 60 years, and the reprocessing plant should match with the change in the power generation plan during the transition period. The ability to supply Pu-fissile has been evaluated for two plant concepts. One is the independent-type concept, which contains two processes for reprocessing either LWR or FBR fuels. The other is the modularized-type concept, which contains only one process for reprocessing both the LWR and FBR fuels. The result showed the superiority of the modularized-type concept over the independent-type concept, because the former can enhance the ability to supply Pu-fissile with less reprocessing capacity. Therefore, the reprocessing plant suitable for the transition period is that based on the modularized-type concept.