著者
善 一章
出版者
Japan Society of Corrosion Engineering
雑誌
Zairyo-to-Kankyo (ISSN:09170480)
巻号頁・発行日
vol.52, no.11, pp.574-579, 2003-11-15 (Released:2011-12-15)
参考文献数
8
被引用文献数
10 9

Port authorities are interested in the behavior of the civil engineering elements of port infrastructure, particularly with respect to the financial, technical, safety and environmental decisions to be taken during the life-time of the structures. It therefore follows that to avoid unexpected large-scale rehabilitation measures as a consequence of neglected periodic maintenance, a systematical planning and budgeting of maintenance activities is necessary. Life Cycle Management (LCM), and its precursor Whole Life Costing (WLC), will contribute to a realistic approach of maintenance policy, including decision-making, planning, budgeting and funding of inspection and repair activities during the life-time of port structures.PIANC PTC-II Working Group 31 (WG31) was constituted in 1993 to review and offer guidance on the use of LCM for new and existing structures in ports and published the LCM Report in 1998. In accordance with the LCM Report, the significance and outline of LCM, the outline and example of WLC and the case study of LCM are presented.
著者
善 一章
出版者
公益社団法人 腐食防食学会
雑誌
材料と環境 : zairyo-to-kankyo (ISSN:09170480)
巻号頁・発行日
vol.59, no.12, pp.448-451, 2010-12-15
参考文献数
7
被引用文献数
4

キャッシュフローは,案評価をするための基礎を形成するので工学経済において重要である.現在価値法は,全ての将来キャッシュフローを現在のドルに変換するので一般的であり,他の案と比べて優れる1案の経済的有利な点を容易に決定する.現在価値は,PW=FW(1+r)<sup>-N</sup>式から求められる;ここで,PW:現在価値,FW:将来価値,r:減価率,N:複利期間.係数 (1+r)<sup>-N</sup>は現在価値係数として知られる.もし減価率がr%でPW,FW,AWに対して一定ならば,3者は等価である.従って,プロジェクトのAW値とFW値は等価のPW値から容易に求められる.<br>本報では,異なる減価係数における現在価値係数の経時変化,PW値からFW値とAW値の等価計算例,PW法の港湾構造物への適用例を示す.