著者
齋藤 隆司 古阪 秀三 平野 吉信
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.80, no.709, pp.689-696, 2015-03-30 (Released:2015-03-30)
参考文献数
35
被引用文献数
1

This paper analyses the influence of postal architecture's quality assurance from the view point of client side. Postal architecture is very unique tradition, having both clients and architects function in the organization. Postal architecture was born in 1885, with over 130 years' historical accomplishment. The era of postal architecture has been divided into 4 phases; 1) the era of in-house designers who lead building projects, 2) era of specialists, 3) era of project management, 4) era of externalities and privatization. This paper analyses the changing role of clients and how the environment society has been influenced these changes.
著者
齋藤 隆司 古阪 秀三 平野 吉信
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.81, no.721, pp.723-731, 2016 (Released:2016-03-30)
参考文献数
44

The organization of the Postal Architecture changes its style from public to private since 1886 as the starting point of the ministry of Posts and Telecommunications. The Postal Architecture has also the history that they have designed post offices, training facility for employee, employee's accommodation, hospitals, etc., and supervised their construction projects for 140 years over. This Study makes clear why Postal architects' project management has been established as architect's leading organization in the former ministry of Posts and Telecommunications (1886-1949) in the Meiji, Taisho, and early Showa era by study of related research books and thesis.
著者
西野 佐弥香 高松 伸 古阪 秀三 平野 吉信
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.76, no.659, pp.149-157, 2011-01-30 (Released:2011-03-07)
参考文献数
25
被引用文献数
1 4

Today in Japan, there happens emergence of various professions and diversification of delivery systems. However, some points of the current building system don't accommodate to such changes, so it could cause damage to buildings' quality. To this matter, this study treats cooperation between participants in a building project as one way of enhancing buildings' quality. In these days, designers and constructors had close communication and realized high quality buildings in many projects. So the purpose of this study is to show a decision making process of design contents in Kyoto Takaragaike Prince Hotel led by Togo Murano and to consider how designers and other participants, especially constructors cooperated in this project.
著者
西野 佐弥香 高松 伸 古阪 秀三 平野 吉信
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.75, no.654, pp.1979-1986, 2010-08-30 (Released:2010-10-08)
参考文献数
23
被引用文献数
2 4

Today, there are some problems in construction projects, for example, insufficient communication between designers and constructers, confusion about roles and responsibilities, and so on. On the other hand, in these days, designers and constructers had close communication and realized high quality buildings in many projects. This study aims to show a decision making process of design contents in such projects. As a typical one, this study deals with Tokyo Metropolitan Art museum designed by Mayekawa Associates, Architects & Engineers, based on interviews to parties and examinations of drawings and specifications and shop drawings.
著者
高麗 一大 古阪 秀三 金多 隆 平野 吉信 江頭 知幸
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.73, no.623, pp.183-190, 2008-01-30 (Released:2008-10-31)
参考文献数
14
被引用文献数
2 4

Today, there are many construction failures in many parts in Japan. This is attributed to the fact that there are some problems in the building construction system. The authors assume that the quality assurance system in construction is composed of four levels. The first level is “law” such as the building standard law. The second level is “standard” such as JIS, JAS, JASS, or the standard specification. The third level is “plans in a particular project” such as drawings, particular specifications, working drawings, construction plans, or working instructions. The fourth level is “the technology/skill of the engineer/craftsman”. The quality is to be assured by the complementary relationship among these four levels. These days, projects are getting bigger and more complicated, the procurement system is diversifying, and the technology is advancing. However, “law” doesn't correspond to these changes, and “plans in a particular project” which formerly complemented “law” are not enough now. Therefore, this study focuses on the following aspects.1. Clarify the quality assurance system from the view points of the four levels.2. Clarify the actual conditions of the quality assurance system.3. Clarify the mechanism of the construction failures by using descriptive models.
著者
古阪 秀三
出版者
一般社団法人日本建築学会
雑誌
建築雑誌 (ISSN:00038555)
巻号頁・発行日
vol.105, no.1301, 1990-07-20