著者
香川 涼亮 小倉 利仁 太田 充 牛島 光一
出版者
公益社団法人 都市住宅学会
雑誌
都市住宅学 (ISSN:13418157)
巻号頁・発行日
vol.2017, no.97, pp.126-135, 2017 (Released:2018-06-07)
参考文献数
15

The purpose of this study is to investigate the impact of the Tokyo 2020 Olympic and Paralympic Games announcement on residential land prices. Using the data of official land prices from 2010 to 2015, the degree of the rise of the land prices was measured around the area in which the Olympic Village is built. Just after the announcement of September, 2013 the degree of the rise in land prices was measured around the area in which the Olympic Village is to be built. A rise in land prices of 8.0% around the Olympic Village and an average of approximately 3.0% within 12km of radius was confirmed in 2015 as a result of the estimation. When a proxy indicator of the urban redevelopments was added as a variable, a rise in land prices of an average of approximately 1.6% within the radius 12km from the Olympic Village was confirmed. In other words, these estimated results suggest the possibility that about half of rise in land prices was due to the influence of urban development.