著者
柴田 俊一
出版者
一般社団法人 日本原子力学会
雑誌
日本原子力学会誌 (ISSN:00047120)
巻号頁・発行日
vol.26, no.3, pp.211-216, 1984-03-30 (Released:2009-04-21)

National Committee for Nuclear Energy Research, Japan Science Council has completed a future plan for basic nuclear energy research by university researchers. The JSC has recommended the promotion of basic research for nuclear energy based on the plan in 1983. The future plan consists of four main research fields, namely, (1) improvements of reactor safety, (2) down stream, (3) thorium fuel reactors, and (4) applications of research reactor and radioisotopes.
著者
白井 孝治 伊藤 千浩 加藤 安久 服部 清一 三枝 利有 大沼 博志
出版者
一般社団法人 日本原子力学会
雑誌
日本原子力学会誌 (ISSN:00047120)
巻号頁・発行日
vol.37, no.5, pp.430-441, 1995-05-30 (Released:2010-01-08)
参考文献数
13

Cask-storage is the best method for storing spent fuels at a reactor site. It is necessary to confirm the integrity of a cask subjected to impact load caused by cask mishandling drop accident because it is one of the technical issues to be considered in the safety analysis for cask and storage house. In this paper, an evaluation method of the dynamic interaction between cask and floor of the Storage facility Subjected to impact load is proposed. Firstly, the cask drop tests onto the reinforced concrete slab representing floor of the storage facility were conducted. Test results showed that the structural integrity of the cask was maintained even under impact load due to free drop caused by mishandling of cask. Secondly, drop analysis was performed using a finite element method analysis code considering concrete model developed at our laboratory, and compared with the experimental results. As a result, the applicability of this code for drop impact analysis of the cask was confirmed.
著者
榎本 穣
出版者
Atomic Energy Society of Japan
雑誌
日本原子力学会誌 (ISSN:00047120)
巻号頁・発行日
vol.19, no.8, pp.530-534, 1977

Fukushima Daiichi Nuclear Power Station Unit-3 is a BWR unit located in the seaside area of Okuma town in Fukushima Prefecture. Its thermal output is 2, 381 MWt; and the electrical rating is 784 MWe. The construction at the site started in Aug. 1970; and the commercial operation began on Mar. 27, 1976. The plant has been operated satisfactory and was shutdown Mar. 1, 1977 for the first annual inspection outage.<br>Here are the summary of the plant facility and the operating experience.