著者
小野田 滋 山田 稔 井上 和彦 松岡 義幸
出版者
Japan Society of Civil Engineers
雑誌
土木史研究 (ISSN:09167293)
巻号頁・発行日
vol.10, pp.211-222, 1990-06-25 (Released:2010-06-15)
参考文献数
33

The section betweeh Nagahama and Kobe on Tokaido Line is a very important one for tunnel history, because it includes the first railway tunnel ever bored in Japan, and the first railway tunnel completed solely by the force of Japanese engineers. But many of the original tunnels in this territory have been abandoned for repeated relocation or track addition works. This paper describes the history and present state of these tunnels based on field surveys and historical records. For instance, the first Osakayama Tunnel was replaced with a new tunnel following a new route taken Otu and Kyoto in Taisyo Era, and added wuth next tunnels to meet the traffic increase in Syowa Era. This case study reveals that the tunnels was built with various inside shape reflecting the age of their construction.
著者
藤原 康雄 奥野 博久 松岡 義幸 萱原 瑞穂
出版者
Japan Society of Civil Engineers
雑誌
土木史研究 (ISSN:09167293)
巻号頁・発行日
vol.11, pp.191-196, 1991-06-05 (Released:2010-06-15)
参考文献数
6

JR大阪環状線は戦後の復興の中から大阪市民の強い要望により1956 (昭和31) 年3月20日に着工され、1961 (昭和36) 年4月に完成した。しかしながら「の」字運転のためににそれほどの効果が期待されず、ほぼ同時に旧西成線の高架化も着工し、1964 (昭和39) 年に完成した。この年は東京オリンピック、東海道新幹線の開通と大きなプロジェクトが成功した。環状線の開通は種々の困難を乗り越え、最新の技術を酷使し、城東線と西成線をむすぶことによって旅客の流動の差を2倍程度に押さえ、大阪市の発展に多大な効果があった。
著者
藤原 康雄 奥野 博久 松岡 義幸 萱原 瑞穂
出版者
Japan Society of Civil Engineers
雑誌
土木史研究 (ISSN:09167293)
巻号頁・発行日
vol.11, pp.191-196, 1991

JR大阪環状線は戦後の復興の中から大阪市民の強い要望により1956 (昭和31) 年3月20日に着工され、1961 (昭和36) 年4月に完成した。しかしながら「の」字運転のためににそれほどの効果が期待されず、ほぼ同時に旧西成線の高架化も着工し、1964 (昭和39) 年に完成した。この年は東京オリンピック、東海道新幹線の開通と大きなプロジェクトが成功した。<BR>環状線の開通は種々の困難を乗り越え、最新の技術を酷使し、城東線と西成線をむすぶことによって旅客の流動の差を2倍程度に押さえ、大阪市の発展に多大な効果があった。