著者
角 哲 中江 研 中野 茂夫 小山 雄資 平井 直樹
出版者
日本建築学会
雑誌
日本建築学会計画系論文集 (ISSN:13404210)
巻号頁・発行日
vol.79, no.701, pp.1673-1681, 2014-07-30 (Released:2014-09-30)
被引用文献数
1 2

This paper examines land selection process for new factory and development of worker's settlement by Nippon Steel Co.Ltd. in the 1930's from 3 scales, region, city and settlements. It was first time for Nippon Steel to construction of factory at a place near big cities. That location was a general tendency of at that time. Japanese government and Hyogo Prefecture restricted development by Nippon Steel aiming at realization of ideal city planning. The plan of urban development of Hyogo prefecture and Nippon Steel were differed greatly. Nippon Steel acquired the company residence sites as a factory, and constructed company houses.

言及状況

外部データベース (DOI)

Twitter (1 users, 1 posts, 0 favorites)

https://t.co/YUihn7HdHn 広畑製鉄所 都市計画

収集済み URL リスト