著者
田所 真之 進士 誉夫 チョン イェウン 山本 博巳 山地 憲治
出版者
一般社団法人日本エネルギー学会
雑誌
日本エネルギー学会大会講演要旨集
巻号頁・発行日
no.19, pp.380-381, 2010-08-02

The objective of this study is to evaluate the potential for CO2 emission reduction of LNG life cycle by using the following technologies: concentrated solar power (CSP) plant, LNG cryogenic power generating system and gas pressure differential power recovery system. Results indicate LNG life cycle has high potential for reducing CO2 emission and it is actually more cost effective than avoiding CO2 emission from generating electricity by using some of the zero emission power sources.
著者
高木 雅昭 岩船 由美子 山本 博巳 山地 憲治 岡野 邦彦 日渡 良爾 池谷 知彦
出版者
一般社団法人 電気学会
雑誌
電気学会論文誌. B, 電力・エネルギー部門誌 = The transactions of the Institute of Electrical Engineers of Japan. B, A publication of Power and Energy Society (ISSN:03854213)
巻号頁・発行日
vol.130, no.7, pp.651-660, 2010-07-01
参考文献数
19
被引用文献数
3 1

In the power sector, the national government has set the goal that the introduction of PV reaches 53 million kW by 2030. However, large-scale introduction of PV will cause several problems in power systems such as surplus electricity. We need large capacity of pumped storages or batteries for the surplus electricity, but the construction costs of these plants are very high. On the other hand, in the transport sector, Electric Vehicle (EV) is being developed as an environmentally friendly vehicle. To promote the diffusion of EV, it is necessary to build infrastructures that can charge EV in a short time; a battery switch station is one of the solutions to this problem. At a station, the automated switch platform will replace the depleted battery with a fully-charged battery. The depleted battery is placed in a storage room and recharged to be available to other drivers. In this study, we propose the use of station's battery as a countermeasure for surplus electricity of PV and evaluate the economic value of the proposed system. We assumed that 53 million kW of PV is introduced in the nationwide power system and considered two countermeasures for surplus electricity: (1) Pumped storage; (2) Battery of station. The difference in total annual cost between Pumped case and Battery case results in 792.6 billion yen. Hence, if a utility leases the batteries from stations fewer than 792.6 billion yen, the utility will have the cost advantage in Battery case.